Combined reactions have trailed the latest demolition of the Head Workplace of the Innoson Car Manufacturing (IVM) at Nnewi-Owerri Highway at Nnewi in Nnewi North Native Authorities Space of Anambra state by the state authorities.
The IVM Head Workplace constructing was partly demolished by the state authorities to make means for the continued street growth within the space.
The magnificent constructing has been rendered ineffective by the demolition train, which additionally effected a whole bunch of different buildings, outlets, and different buildings positioned alongside the identical street and different street constructions happening in another elements of Nnewi and its environs, leaving many in loss.
The demolition train has sparked off a series of reactions and counter-reactions, each among the many affected individuals and anxious authorities.
One other facet of the train that has sparked off one other strand of reactions was the hypothesis and allegation that the perimeter fence of the St Mary’s Professional-Cathedral, Nnewi, which blocks the best way for the development of a drainage channel within the ongoing street growth, was spared and averted, following the alleged refusal of the authorities of the Diocese for anybody to ‘contact’ the church fence, allegedly making the contractor to assemble drainage on just one aspect of the street within the space, sparing the aspect of the church fence.
Confirming the demolition of its Head Workplace constructing, the Innoson Car Manufacturing (IVM) firm expressed displeasure over the incident.
Learn additionally: UNIJOS begins 500-seater auditorium mission to spice up tutorial excellence
Reacting, Mr Cornel Osigwe, the Head of Company Communications at Innoson Group, mentioned there was no pre-demolition discover served them by anybody forward of the demolition, including that it got here to them as a shock.
In response to him, the workplace perimeter fence, some places of work, the staircase and the corporate’s showroom had been affected by the partial demolition.
His phrases: “We didn’t know that the constructing itself was marked for demolition, and if it was marked, they need to have given us time to relocate.
“The employees had been working, and so they simply noticed the demolition automobile demolishing the constructing whereas work was happening.
“A few of our employees had been trapped within the constructing; it took the efforts of our different employees to rescue people who had been trapped whereas over 20 autos had been additionally trapped.
“A day earlier than the demolition, there was an announcement that there was going to be a demolition, and so they had been going to present one week for the homes that had been marked for demolition to relocate.
“The corporate was not conscious that it was additionally marked for demolition, and even when it was conscious.
“We’re shock when demolition was happening, they need to have given us a grace and notify us.
“There was a public announcement that every one the marked buildings have one week to relocate, however many issues weren’t thought-about.
“There have been different buildings that had been near the top workplace and marked for demolition that weren’t demolished, however they got here straight to our constructing and demolished it, making us surprise if there was one other ulterior motive to it.”
When requested if the demolition might be because of a political witch-hunt, the IVM Spokesman mentioned he didn’t assume the state authorities would deliberately determine to demolish the corporate.
“Gov. Chukwuma Soludo has been an awesome supporter of Innoson Car, and Innoson has been an awesome supporter of the state authorities.
“However the best way and method that the whole lot occurred makes us surprise if the state authorities is conscious that these dealing with the demolition have a private vendetta in opposition to the corporate.”
Engr. Ifeanyi Okoma, the Commissioner for Works, mentioned the Innoson Car Manufacturing (IVM) Head Workplace constructing was among the many buildings marked for demolition for street development within the state.
Okoma defined that every one the affected buildings had been marked very long time in the past, including that the individuals had been duly knowledgeable earlier than the demolition train.
His phrases: “These buildings had been marked someday in December or January. We aren’t taking a look at people; it’s one thing that cuts throughout the entire place, and it’s not personalised.
“Even the Catholic Church and each different constructing that’s alongside the street weren’t going to be exonerated. These roads had been designed to decongest visitors gridlock skilled throughout pageant intervals,” he mentioned.
He emphasised that there was no political undertone behind the demolition train, as being speculated, stressing that there isn’t a problem or rift between the state authorities and IVM.
“Soludo is the one governor nationwide that makes use of made-in-Nigeria autos. Chief Innoson is our man; anyone attempting to create a mistaken narrative in regards to the demolition train doesn’t imply properly,” he affirmed.
In the meantime, the continued demolition and street development have continued to generate reactions and counter-reactions among the many residents.
