Germany wraps up ‘progressive’ tender with common value of €0.0833/kWh

Germany wraps up ‘progressive’ tender with common value of €0.0833/kWh

Germany has concluded a brand new renewables tender, securing 408 MW of capability at a mean value of €0.0833 ($0.09)/kWh.

Picture: Tesvolt

From pv magazine Germany

Germany has concluded a current tender for innovative renewable power tasks. The train drew 53 bids with a complete capability of 779 MW. The authorities awarded 32 tasks with a complete capability of 408 MW.

The German Federal Community Company (Bundesnetzagentur) mentioned the tariffs ranged from €0.077/kWh to €0.0878/kWh, with a mean value of €0.0833/kWh.

Bavaria obtained probably the most awarded capability, with 19 tasks totaling 258 MW, whereas different states additionally secured tasks. As well as, 21 tasks, accounting for 175 MW, will probably be constructed on 500-meter broad strips of motorways or railways, following an enlargement of eligible areas below Germany’s renewable power legislation firstly of this 12 months.

“After two weak rounds, the innovation tenders have picked up pace once more,” mentioned Klaus Müller, president of the Bundesnetzagentur. “The oversubscription exhibits what dynamic renewables can have. Now it’s essential to keep up the present stage of venture improvement.”

This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and want to reuse a few of our content material, please contact: editors@pv-magazine.com.

Read More

Read Previous

Uganda closes six radio stations for working with out licences

Read Next

Novel perovskite/CIGS tandem PV cell design guarantees 38.39% effectivity

Leave a Reply

Your email address will not be published. Required fields are marked *